This article describes how to fit a spline and compute a simultaneous confidence interval.
Requirements
You will need:
- A Date/Time structure variable.
- At least one Numeric structure variable.
Method
- Select Anything
> Advanced Analysis > Test > Spline with Simultaneous Confidence Interval from the toolbar, or from the Report tree, click + > Advanced Analysis > Test > Spline with Simultaneous Confidence Interval.
- From the object inspector
, go to Outcome, and select a numeric structure variable
- For Predictor, select a Date/Time structure variable
- For Regression type, select the Regression type you want to use:
- Binary Logit - this is the default.
- Linear
- Set the Confidence interval % - the default is 95
- Set the Draws to show - the default is 30
- Set the Random seed - the default is 12321